Construction on two new 28-storey (about 100 m) tower buildings is under way, each of which will have approximately 300 hotel rooms or apartments. The construction area will be about 70,000 m2.
Project Duration
March, 2023 - 4th qu. 2024
Address
Sochi
Construction Company
LLC "Yenigun Construction"
Project details
• Core walls are built with the help of the self-climbing formwork system SKE100 plus installed in the narrow building shafts.
• Walls of the corridor are made with the self-climbing formwork system Xclimb 60. 12-meter guiding rails pass through the existing technological holes in the interstorey floor slabs.
• The building frame is protected with wind shields Xclimb 60.
• Massive floor slabs are formed on load-bearing towers d3.